OVIC-SERVICE Over many years of successful work in the construction market of the Sakhalin region, the "World of Climate" company has grown into a large construction company.
OVIC-SERVICE Consequently, in 2019, a decision was made to reorganize the internal engineering networks installation direction into a separate organization, "OVIC-SERVICE".
Main areas of activity:
Design and installation of internal engineering systems of buildings;
Supply of ventilation, air conditioning, and refrigeration system equipment;
About the company's production and staffing capacities:
Large staff
of highly qualified specialists - more than 30 employees;
OVIC-SERVICE Our story began with the founding of the "World of Klimt" company in 2013
Technical maintenance of building engineering systems;
Robotic cleaning and disinfection of air ducts and equipment of ventilation and air conditioning systems.
Own production of metal structures
made of ferrous and non-ferrous metals, equipped with a CNC laser cutting machine;
Own production
for manufacturing sheet steel products for ventilation and air conditioning systems with a production capacity of over 5000 m² per month;
A laboratory for testing, diagnostics, and repair of equipment and automation devices, own fleet of vehicles and specialized machinery.
The company "OVIC-SERVICE" is a partner and performs installation, commissioning, maintenance, and repair of equipment from leading manufacturers of climate equipment.
OVIC-SERVICE Over many years of operation, our company has successfully completed more than 50 projects, among them: the "Luch" Shopping Center in Yuzhno-Sakhalinsk, the Central District Hospital in Alexandrovsk-Sakhalinsky, the "Kholmstk-Arena" Sports Complex in Kholmstk, Gymnasium No3 in Yuzhno-Sakhalinsk, the Educational Laboratory Building of Sakhalin State University in Yuzhno-Sakhalinsk, the Surgical Building of the GBUZ "Sakhalin Regional Oncological Hospital", the Perinatal Center and the Gynecological Building of the GBUZ "Sakhalin Regional Clinical Hospital", the School of Arts in Yuzhno-Sakhalinsk, the base of the MUP "Automotive Enterprise" in Yuzhno-Sakhalinsk, and others.
We design and build reliable engineering systems
MUP Automotive Enterprise of Yuzhno-Sakhalinsk
The network of air ducts spans over 9000 m², with the total air capacity of the equipment exceeding 150,000 m³/h. Implementation period: from 2023 to the present. The project involved equipment supply, installation of ventilation and air conditioning systems, installation of industrial aspiration systems, and commissioning works.
Educational Laboratory Building of Sakhalin State University Yuzhno-Sakhalinsk
The network of air ducts covers more than 9000 m², with the total air capacity of the equipment exceeding 80,000 m³/h. Implementation period: from 2014 to 2015. The project included the installation of heating, ventilation, and air conditioning systems, electrical systems, water supply and sewage systems, and commissioning works.
The network of air ducts covers more than 22,000 m², with the total air capacity of the equipment exceeding 300,000 m³/h, and the cooling supply equipment capacity over 0.8 MW. Implementation period: from 2021 to 2023. The project involved repair and restoration works, commissioning of 238 ventilation systems, technical maintenance, cleaning, and disinfection of ventilation systems.
Perinatal Center of GBUZ "SOKB" Yuzhno-Sakhalinsk